Lower utility bills? This is where it all starts. Patrick is removing all the insulation and debris in the attic space. It will then be vacuumed, the wiring cleaned up, and a meticulous foam air sealing at every joint/connection/hole that penetrates the insulated envelope, including each rafter poking out of the attic.
May 20, 2009